Haihao, a leading hospital cleanroom manufacturer in China, supplies prefabricated cleanroom wall and ceiling panel systems engineered to solve the number one headache for hospital general contractors: extended on-site construction timelines. Traditional built-up cleanroom walls require extensive cutting, welding, grinding, and sealing on site—a process that can stretch 8–12 weeks per operating room and creates uncontrollable dust contamination in adjacent hospital zones. Our factory-prefabricated panel system flips this model, moving 90% of fabrication work into our controlled factory environment.
Each panel arrives at the job site pre-cut to exact dimensions, with interlocking tongue-and-groove joints, integrated gasket seals, and pre-finished anti-microbial surfaces. Installation becomes a dry-assembly process: panels click together with concealed fasteners, requiring no on-site welding, no wet trades, and minimal skilled labor. The result is a completed OR enclosure in 2–3 weeks instead of 8–12, dramatically compressing the critical path on your hospital construction schedule.
Key Features| Parameter | Specification |
|---|---|
| Panel Core Material | PIR (polyisocyanurate) 50mm / 75mm / 100mm |
| Steel Facing Thickness | 0.45mm or 0.5mm galvanized steel, pre-coated |
| Surface Treatment | Anti-microbial coating, matte white (RAL 9016 standard) |
| Fire Performance | Class A (GB 8624), equivalent EN 13501-1 Class B-s1,d0 |
| Thermal Conductivity | ≤0.022 W/(m·K) at 23°C |
| Panel Weight | 12–15 kg/m² (50mm) / 16–20 kg/m² (75mm) |
| Joint Airtightness | ≤0.5 m³/(h·m²) at 50Pa (EN 12114) |
| Panel Width | Standard 900mm, 1000mm, 1180mm (custom available) |
| Panel Length | Up to 6000mm (customizable to room height) |
| Sound Reduction | Rw ≥ 28 dB (50mm) / Rw ≥ 32 dB (75mm) |
| Chemical Resistance | Resistant to peroxides, alcohols, quaternary ammonium, and chlorine-based disinfectants |
| Accessories Included | Internal/external corners, cove bases, ceiling adapters, door frames, trim profiles |
| Installation Labor | 3–4 workers per 100 m² per day (dry assembly, no welding) |
This prefabricated panel system is the backbone of modern hospital operating room construction, designed for general contractors managing new-build hospitals, surgical department expansions, ICU retrofits, and clean corridor installations. It integrates seamlessly with Haihao laminar flow ceiling systems, cleanroom doors, and medical utility panels for a fully coordinated enclosure solution. The system is equally suited for pharmaceutical cleanrooms, medical device manufacturing suites, and biosafety laboratories requiring ISO 5 through ISO 8 classification. Its dry-assembly methodology makes it the preferred choice for projects where construction must proceed adjacent to active hospital operations, as it generates zero on-site contamination during installation.
Packaging & Quality AssurancePanels are packed face-to-face with protective foam interleaving and loaded into fumigated steel-reinforced plywood crates. Each crate is wrapped with multi-layer moisture barrier film and secured with desiccant packs for ocean freight protection. Every shipment includes a numbered panel layout diagram, installation sequence guide, and QR code linking to assembly videos. Factory quality control includes dimensional tolerance checks on every panel, coating adhesion testing per ASTM D3359, and fire performance certification per batch. We offer a 5-year structural warranty on panel integrity and a 2-year warranty on anti-microbial surface finish performance. As your dedicated hospital cleanroom manufacturer in China, we provide pre-shipment inspection reports and welcome third-party quality audits at our facility.